Supplier selection
Contents |
[edit] Introduction
In the construction industry, ‘supplier’ is a very general term which refers to organisations contracted as part of the delivery of a built asset.
Critical steps in the supplier evaluation and selection process are:
- Recognising the need for a supplier.
- Determining the criteria for supplier selection.
- Identifying potential suppliers.
- Shortlisting suppliers.
- Evaluating and selecting the supplier.
- Contracting the selected supplier.
[edit] The need for a supplier
Suppliers might be need for a wide range of purposes, including:
- Consultancy services such as design and project management.
- Enabling and demolition works.
- The main construction contract works.
- Specialist sub-contract works.
- The supply of plant.
- The supply of products and materials.
- Maintenance and operation services.
Potential suppliers might be identified by research, advertising, recommendation, open competition (with or without design), selective competition (with or without design), or through an existing relationship such as a framework agreement.
[edit] Selection criteria
Some of the most common criteria that are used to select suppliers are set out below:
- Process and design capabilities: The supplier should have relevant previous experience, and should have the capability to supply as required.
- Quality: The product/service should be of a sufficient quality or meet the required specification.
- Cost: Total supplier costs should be assessed, including the product/service cost, ordering cost, logistics costs, lifecycle costs, delivery charges, and so on.
- Service: The ability of the supplier to provide an appropriate level of service, such as technical support post-purchase. What value added does the supplier offer?
- Capacity: The ability of the supplier to meet the requirements in accordance with the required delivery schedule.
- Location: The geographical location of a supplier may affect the delivery lead-time, transport and logistics costs, availability of support and so on.
- Management capability: The supplier’s track record on continuous improvement of their processes and standards, and their ability to maintain good relationships with their clients.
- Financial stability: Will they continue to be a reliable source of supply or are a risk to the project?
- Ordering system: The robustness and sophistication of the ordering system can impact on supply chain performance, and should be as easy and efficient as possible, with short delivery lead times.
- Compliance: Whether the supplier is fully compliant with environmental regulations, health and safety requirements, quality assurance standards and so on.
- Longer-term relationship: Whether they have the potential of being a long-term partner, with a willingness to share technologies and information in a mutually beneficial manner.
- Innovation: Is the supplier able to offer innovative products or services that would bring added value to the project?
- Proposed methodology: This might include mobilisation plans, design proposals, and non-compliant proposals if these have been allowed.
See also: Tender evaluation
[edit] Selection methods
Some of the methods that can be used as a means of determining how a supplier fits the criteria listed above include the following:
- Pre qualification questionnaire.
- Obtaining financial information, such as a publically-available report.
- Providing specifications and requesting a formal quote from the supplier.
- Pre-tender and mid tender interviews.
- Arranging a meeting or visit to the supplier.
- On-site assessment.
- Request for certificates to confirm capability.
- Feedback from other clients.
- Assessing industry databases or reviews.
- Evaluation of samples.
For more information see: Tender process and tender evaluation.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.